Please ensure Javascript is enabled for purposes of website accessibility

Extração e análise de quantitativos em projetos arquitetônicos de edificações desenvolvidos em BIM

dc.contributor.advisorAugusto, Allan Rodrigues
dc.contributor.advisorLatteshttps://busca-cv-lattes.cnpq.br/curriculo/8146435725202571
dc.contributor.authorGonsalves, João Lucas Belarmino
dc.contributor.authorLatteshttps://busca-cv-lattes.cnpq.br/curriculo/0618677005648662
dc.date.accessioned2026-11-26T01:41:37Z
dc.date.available2026-11-26T01:41:37Z
dc.date.issued2026
dc.descriptionTrabalho de Conclusão de Curso (Monografia) apresentado ao curso de Engenharia Civil do Instituto Federal de Educação, Ciência e Tecnologia de Rondônia (IFRO) – Campus Porto Velho Calama, como requisito parcial para obtenção do Título de bacharel em Engenharia Civil.
dc.description.abstractA extração de quantitativos fundamenta o orçamento de obras, e o levantamento manual em CAD e a extração automatizada em BIM diferem quanto ao esforço, aos erros e à informação exigida do projeto. Este trabalho compara os dois métodos na quantificação de uma residência unifamiliar térrea, baseada no projeto-padrão R1N da NBR 12721, para analisar de que maneira a metodologia BIM interfere nesse processo. O projeto foi modelado no Revit 2025 e quantificado no AutoCAD 2025 e no Revit, com os mesmos critérios de medição e com insumos calculados pelos coeficientes do SINAPI, sem preços. Foram registrados os erros, o tempo, a qualificação exigida e os riscos, e foram simuladas duas alterações de projeto. Dos 17 itens comparados, 9 coincidiram em duas casas decimais, 4 diferiram em até 0,12 m² (ou m³) por arredondamento ou critério de medição e 4, todos nas paredes (alvenaria de 10 e de 20 cm, revestimento e pintura), apresentaram diferenças de 3,79% a 12,73% que não foram conciliadas. No CAD não houve erro registrado, e as três ocorrências do BIM foram na garagem. A quantificação levou 02:33:16 no CAD e 00:00:54 no BIM, sem contar a modelagem, e o BIM atualizou automaticamente as tabelas parametrizadas nas simulações. Em seguida, esses resultados foram reunidos em uma matriz de risco, com probabilidade e impacto na mesma escala para os dois métodos: o CAD teve um risco de nível alto, o item não medido (a cumeeira), e o BIM teve quatro, ligados ao erro de modelagem, ao critério de medição, à informação ausente e ao item não modelado. Assim, a metodologia BIM desloca o esforço da medição manual para a modelagem e a parametrização, e os riscos da atualização manual para a modelagem e a informação do modelo, de modo que a qualidade do quantitativo passa a depender da informação definida nele. Os resultados, restritos a um projeto e a um operador, não indicam a superioridade de um método.
dc.description.abstract2The extraction of quantities is fundamental to the budgeting of construction projects, and manual CAD surveying and automated BIM extraction differ in terms of effort, errors, and the information required from the project. This work compares the two methods in the quantification of a single-family, single-story residence, based on the NBR 12721 standard project R1N, to analyze how the BIM methodology interferes in this process. The project was modeled in Revit 2025 and quantified in AutoCAD 2025 and Revit, using the same measurement criteria and with inputs calculated using SINAPI coefficients, without prices. Errors, time, required qualifications, and risks were recorded, and two project changes were simulated. Of the 17 items compared, 9 coincided within two decimal places, 4 differed by up to 0.12 m² (or m³) due to rounding or measurement criteria, and 4, all on the walls (10 and 20 cm masonry, cladding, and paint), showed differences of 3.79% to 12.73% that could not be reconciled. No errors were recorded in the CAD model, and the three BIM occurrences were in the garage. Quantification took 2 hours, 33 minutes, and 16 seconds in the CAD model and 54 minutes in the BIM model, not including modeling, and the BIM automatically updated the parameterized tables in the simulations. These results were then combined into a risk matrix, with probability and impact on the same scale for both methods: the CAD model had one high-level risk, the unmeasured item (the ridge), and the BIM model had four, linked to modeling error, measurement criteria, missing information, and the unmodeled item. Thus, the BIM methodology shifts the effort from manual measurement to modeling and parameterization, and the risks of manual updating to modeling and model information, so that the quality of the quantity take-off comes to depend on the information defined within it. The results, limited to a project and an operator, do not indicate the superiority of one method over another.
dc.identifier.citationGONSALVES, João Lucas Belarmino. Extração e análise de quantitativos em projetos arquitetônicos de edificações desenvolvidos em BIM. Orientador: Allan Rodrigues Augusto. 2026. 104 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil), Instituto Federal de Educação, Ciência e Tecnologia de Rondônia - IFRO, Porto Velho, 2026.
dc.identifier.urihttp://repositorio.ifro.edu.br/handle/123456789/3027
dc.languagePortuguêspt_BR
dc.language.isopt_BR
dc.publisher.campiCampus Porto Velho Calama
dc.publisher.programBacharelado em Engenharia Civil
dc.rightsAcesso aberto
dc.subjectBIM
dc.subjectCAD
dc.subjectExtração de quantitativos
dc.subjectProjeto arquitetônico
dc.subjectRevit
dc.subject.keywordBIM
dc.subject.keywordCAD
dc.subject.keywordQuantity takeoff
dc.subject.keywordArchitectural design
dc.subject.keywordRevit
dc.titleExtração e análise de quantitativos em projetos arquitetônicos de edificações desenvolvidos em BIM
dc.typeTrabalho de Conclusão de Curso

Arquivos

Pacote Original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
TCC_JOAO_LUCAS_BELARMINO_GONSALVES.pdf
Tamanho:
7.71 MB
Formato:
Adobe Portable Document Format

Licença do Pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
682 B
Formato:
Item-specific license agreed upon to submission
Descrição: